JUMP TO CONTENT

Open and close mobile menu

back
EN

Insights Skikda combined cycle power plant

AtkinsRéalis has a strong presence in Algeria’s industrial sector, where we financed, designed, built, and currently operate and maintain two combined-cycle power plants and a desalination plant.
AtkinsRéalis is now responsible for the execution of preventive, predictive and corrective maintenance programs and periodic shutdowns for planned maintenance and refurbishment outages of these plants. Water and electricity are public services that need to be provided without interruption, so we guarantee plant availability and performance 24 hours a day and seven days a week.

Skikda Combined-Cycle Power Plant

As part of a wider government program to generate more power from Algeria’s own gas reserves, Shariket Kahraba Skikda S.p.a, awarded AtkinsRéalis a contract to design, build, operate and maintain the Skikda Combined-Cycle Power Plant.
Nestled within a large industrial zone in northeastern Algeria, Skikda boasts dual fuel capabilities and runs mainly on natural gas. Generating 825 MW in a multishaft arrangement with two GE 9FA gas turbine generators, two Alstom steam turbine generators and two heat recovery boilers, the plant has helped increase Algeria’s production capacity by over 10% while reducing greenhouse gases emissions. The operations and maintenance contract for the power plant began in 2006, and will continue through to 2023. 

Hadjret en Nouss

AtkinsRéalis has also designed, built and is currently operating and maintaining a thermal combined-cycle power plant in Hadjret en Nouss that will supply an additional 1,227 MW of capacity to Algeria's power grid. Power is generated by three GE single-shaft power trains with the plant operating on natural gas as the primary fuel and light oil as a backup fuel. While the plant was nearing completion in 2009, AtkinsRéalis began a separate mandate to operate and maintain the facility for 20 years. AtkinsRéalis has a 26% ownership interest in the Hadjret en Nouss utility.

Fouka Desalination Plant

Since more than 90% of Algeria’s national territory is covered by the Sahara Desert, the Algerian Government is making large investments to enhance the country’s water infrastructure. To help meet the potable water needs of Zeralda and the western part of Algiers, the Algerian Government awarded AtkinsRéalis and Acciona Agua (the reverse osmosis process provider) a contract to finance, build, operate and maintain the Fouka Desalination Plant, a 120 000 m3/day reverse osmosis sea water desalination plant. The operations & maintenance contract began in 2009 and will continue through to 2034.